Case Studies

Limestone Spalling Failure on Exterior Deck
A 31 story condominium development had installed approximately 11,627 square feet of Jerusalem limestone tile on a suspended exterior deck floor located on the 6th level of the building. The natural stone installation was installed about 3 years earlier as a replacement of the original tile. The stone started showing indications of deterioration and cracking not long after the stone installation was completed. Read More